Reference material, and a straight list of what is not written yet.

What exists is linked. What does not exist is marked in preparation with the reason it is not ready. There are no download buttons pointing at placeholder files, and there are no specification sheets fabricated to fill a gap.

Palisaro does not currently hold or publish test ratings, certifications or warranty terms for any configuration on this site. A project that requires a rated system or specific warranty coverage should raise it before quoting.

01Selection guides

Choosing a system and a purchasing path.

How the two purchasing paths differ, how the configurator handles compatibility, and how to read a panel specification.
  • What each path involves, what Palisaro needs from you at each stage, and which one usually fits a given project type.

    guide

  • What the four compatibility states mean, why an option gets disabled, and what happens to a configuration flagged for review.

    reference

  • Reading a panel specification

    In preparation

    Picket profile, rail count and arrangement, on-centre spacing, top treatment, panel width versus post spacing — what each field controls on site.

    guide

  • Matching posts and hardware to a panel system

    In preparation

    Line, corner, terminal and gate posts, when to use routed versus bracketed connections, and how gate hardware is sized to leaf weight.

    guide

02Project checklists

What to have ready before requesting pricing.

A quote turns around at the speed of the information attached to it. These are the fields that make the difference.
  • Quantities, panel and gate counts, heights, finish, delivery site and required date. The checklist that makes a quote turn around quickly.

    checklist

  • Everything in the supply list, plus site address, access, surface conditions, known services and any scheduling constraints.

    checklist

  • Site measurement worksheet

    In preparation

    A field sheet for recording run lengths, corner angles, grade change, gate openings and obstructions before requesting pricing.

    checklist

  • Pre-installation site readiness

    In preparation

    Locates, access, staging space, surface conditions and what has to be resolved before an installation crew is scheduled.

    checklist

03Site considerations

The conditions that change a fence project.

Six things that decide how a fence goes in, and how much it costs to put there. Each one is far cheaper to raise during quoting than to discover during installation.
01
Grade change
Sloped ground is handled either by stepping panels or by racking them, and not every system can rack. Where a run crosses a grade change, the approach affects panel count, post height and how the fence line looks. Record grade change during measurement, not during installation.
02
Frost depth and footings
Footing depth in Ontario is governed by local frost depth, soil conditions and the loads the fence carries. It is a site-specific determination. Taller panels, solid screening and gate posts all increase what the footing has to do.
03
Locates and buried services
Underground locates are required before any post hole is dug. On private property, privately owned services — irrigation, low-voltage lighting, private gas runs — are frequently not covered by a public locate and need to be identified by the owner.
04
Property lines and by-laws
Fence height limits, setbacks, corner visibility triangles and pool enclosure rules are municipal and vary across Ontario. Confirming the governing requirements is the property owner's responsibility, and it is worth doing before ordering rather than after.
05
Winter conditions
Snow clearing damages fence lines near driveways and walkways. Drop-rod sockets fill with ice. Gates that swing over a surface that heaves will bind. These are predictable and can be designed around if raised early.
06
Wind loading on solid panels
Louvre and privacy panels carry substantially more wind load than open picket fence of the same height. Post section, embedment and spacing must be sized for the panel area rather than carried over from a picket layout.

04Technical documentation

In preparation.

Drawings, coating specifications, hardware schedules, warranty terms and certifications. None of these exist yet, and none are presented as though they do.
  • Panel elevation drawings

    In preparation

    Dimensioned elevations for each system. Requires confirmed product data from suppliers before it can be published.

    drawing

  • Post and footing details

    In preparation

    Embedment and footing details by panel height and post section. Requires engineering review before publication.

    drawing

  • Finish and coating specification

    In preparation

    Coating system, preparation and colour references. Awaiting confirmation from the coating supplier.

    reference

  • Gate hardware schedules

    In preparation

    Hinge and latch selection by leaf weight, width and duty cycle. Awaiting confirmed hardware data.

    reference

  • Warranty terms

    In preparation

    Not yet issued. Warranty coverage has not been finalized and is not offered or implied.

    policy

  • Certifications and test reports

    In preparation

    Palisaro does not currently hold or publish test ratings for any configuration shown on this site. Any project requiring a rated system should raise it before quoting.

    policy

If your project needs documentation to proceed

Some projects cannot move without a dimensioned drawing, a coating specification or a stamped footing detail. Say so on the quote request. It will be answered directly rather than deflected, including where the answer is that the document does not exist yet and what would be needed to produce it.